Rehabilitation of Yamuna foodplains needs over 10 years costing Rs 13.29 crore, NGT told

An expert committee has told the National Green Tribunal that the rehabilitation of Yamuna floodplains which was destroyed due to a cultural extravaganza organised by Sri Sri Ravi Shankar's Art of Living (AOL), will cost Rs 13.29 crore and take almost 10 years.

author-image
nabanita chakorborty
Updated On
New Update
Rehabilitation of Yamuna foodplains needs over 10 years costing Rs 13.29 crore, NGT told

National Green Tribunal

An expert committee has told the National Green Tribunal that the rehabilitation of Yamuna floodplains which was "destroyed" due to a cultural extravaganza organised by Sri Sri Ravi Shankar's Art of Living (AOL), will cost Rs 13.29 crore and take almost 10 years.

The expert committee, headed by Shashi Shekhar, Secretary of Ministry of Water Resources, has informed the green panel that major restoration work has to be carried out to compensate for the damage to Yamuna floodplains. 

"It has been estimated that approximately 120 hectares (about 300 acres) of floodplains of west (right bank) of the river Yamuna and about 50 hectares (120 acres) floodplains of the eastern side (left bank) of the river have been adversely impacted ecologically at different magnitudes," it said. 

The green body had last year allowed AOL to hold three- day 'World Culture Festival' of Sri Sri Ravi Shankar's Art of Living on the Yamuna flood plains while expressing its helplessness in banning the event because of "fait accompli". 

It, however, had imposed Rs 5 crore as interim environment compensation on the foundation for the event's impact on the environment. 

Initially, a four-member committee had recommended that AOL Foundation should pay Rs 100-120 crore as restoration cost for "extensive and severe damage" to the floodplains of Yamuna river. 

Later, a seven-member expert committee had told NGT that the event organised on Yamuna has "completely destroyed" the riverbed. 

Also Read: Yogi Adityanath govt transfers 20 IAS officers in 1st bureaucratic reshuffle

The committee had observed that entire floodplain area used for the main event site between DND flyover and the Barapulla drain (on the right bank of river Yamuna) has been completely destroyed, not simply damaged. 

"The ground is now totally levelled, compacted and hardened and is totally devoid of water bodies or depressions and almost completely devoid of any vegetation. 

"The area where the grand stage was erected (and the area immediately behind it) is heavily consolidated - most likely with a different kind of external material used to level the ground and compress it. 

"Huge amount of earth and debris have been dumped to construct the ramps for access from the DND flyover and from the two pontoon bridges across the Barapulla drain," the expert committee had said. 

The committee, in its 47-page report, has said that due to the three-day event, the floodplain has lost "almost all its natural vegetation" like trees, shrubs, tall grasses, aquatic vegetation including water hyacinth which provides habitat to large number of animals, insects and mud-dwelling organisms. 

It has said that it will cost Rs 13.29 crore and take almost 10 years to rehabilitate the river floodplain.

Also Read: Puducherry power tussle: AIADMK urges PM Modi to step in


National Green Tribunal rehabilitation of Yamuna floodplains Sri Sri Ravi Shankar's Art of Living